Wednesday, April 22, 2009

Backsplash


The installation is complete except for the grout work. The stove hood has been installed and the propane tank and line have been installed, they couldn't hook up the stove because the power outlet in not installed. Tomorrow the backsplash will be grouted and the dishwasher and sink plumbing will be installed.


1 comment:

  1. I hope you're going to post a final shot of everything. It just looks sad with those light bulbs hanging down like that.

    ReplyDelete