Backsplash tile is finally in.

Next week should be the last week. The backsplash tile is in. I have light fixtures for the island and over the sink. The gas man should be able to install the line mid next week.





I have painted most of the dining room. I took the kitchen/hallway color and painted it above the chair rail. I painted the chair rail and window trim the same trim color as the kitchen trim. Then I painted below the chair rail a darker color. I also painted the ceiling so that the hallway transition looks much better. I will have to paint the wall between the kitchen and dining room after the contractor fixes a crack in the wall. Yes, I know I need a new light fixture.