Friday, January 30, 2009

Week - 1 Completed

Week 1 is done. All major destruction has occured. Next week should start with electrical, plumbing and maybe removing the stupid poll between the kitchen and dining room. Appliances have been ordered and will be scheduled for delivery as they are needed.

Day 4 - No More Pink Tile.




Wednesday, January 28, 2009

Day 3 - SNOW DAY

Cabinets - Update.

Cainets are now scheduled to arrive the week of Feb 9,2009.

Sunday, January 25, 2009

Kitchen - Before Photos Slide-Show

Kitchen - Cleanup

The cabinets are empty, the microwave, coffee maker, toaster are setup in the living room and all the dishes and dry food-stuff are packed away into the basement. A large pot of chili has been made and will server as dinner for several nights. We are suppose to have access to the stove for at least the rest of the week, but just in case the chili will be very yummy even if its warmed up in the microwave.

Kitchen - Before Photo


Thursday, January 22, 2009

Kitchen - Remodel Begins

After 20 years of thinking about it, 1 year of really planning and 4 months of tile,cabinet,hardware shopping we are finally going to re-model our kitchen. It hard to believe that we have lived with the same 70's style, bottom of the line stock cabinets, yellow laminte counter top (not really sure what the real color was) and cheap pink/grey tiles (only thing we could afford when we bought the house) for so long. Demo starts on monday , I think that an empty kitchen will look better that what is currently there. If all goes according to plan, the whole process should be complete in 7 weeks. I will be posting pictures of the whole process.